Skip to content

fix(deps): Copy KHD imports into scattermoe_utils #539

fix(deps): Copy KHD imports into scattermoe_utils

fix(deps): Copy KHD imports into scattermoe_utils #539

Triggered via pull request February 21, 2025 21:10
Status Failure
Total duration 2m 28s
Artifacts

format.yml

on: pull_request
sample-config
8s
sample-config
Matrix: lint
Fit to window
Zoom out
Zoom in

Annotations

9 errors
lint (accelerated-moe)
Process completed with exit code 22.
lint (fused-ops-and-kernels)
The job was canceled because "accelerated-moe" failed.
lint (fused-ops-and-kernels)
The operation was canceled.
lint (framework)
The job was canceled because "accelerated-moe" failed.
lint (framework)
The operation was canceled.
lint (attention-and-distributed-packing)
The job was canceled because "accelerated-moe" failed.
lint (attention-and-distributed-packing)
The operation was canceled.
lint (accelerated-peft)
The job was canceled because "accelerated-moe" failed.
lint (accelerated-peft)
The operation was canceled.