Skip to content

Continuous Integration #191

Continuous Integration

Continuous Integration #191

Triggered via schedule March 4, 2025 01:27
Status Failure
Total duration 5m 25s
Artifacts

integration.yml

on: schedule
Matrix: Build and Test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Build and Test (8.0)
Request timeout: /maven2/org/apache/maven/apache-maven/3.9.2/apache-maven-3.9.2-bin.tar.gz
Build and Test (7.2)
Process completed with exit code 2.
Build and Test (7.4)
Process completed with exit code 2.
Build and Test (unstable)
Process completed with exit code 2.