Skip to content

Ruff fixes

Ruff fixes #350

Triggered via push February 1, 2025 09:35
Status Failure
Total duration 25s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
Process completed with exit code 1.
build (3.13)
The job was canceled because "_3_9" failed.
build (3.13)
The operation was canceled.
build (3.12)
The job was canceled because "_3_9" failed.
build (3.12)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.