Skip to content

Merge pull request #1381 from humanprotocol/develop #1

Merge pull request #1381 from humanprotocol/develop

Merge pull request #1381 from humanprotocol/develop #1

Triggered via push February 1, 2024 01:43
Status Failure
Total duration 6h 0m 28s
Artifacts

cd-subgraph.yaml

on: push
Matrix: Deploy Subgraph
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Deploy Subgraph (goerli, goerli-v2)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
Deploy Subgraph (goerli, goerli-v2)
The operation was canceled.
Deploy Subgraph (moonbeam, moonbeam-v2)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
Deploy Subgraph (moonbeam, moonbeam-v2)
The operation was canceled.
Deploy Subgraph (matic, polygon-v2)
The job running on runner GitHub Actions 24 has exceeded the maximum execution time of 360 minutes.
Deploy Subgraph (matic, polygon-v2)
The operation was canceled.