Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Add term of zone #50

Merged
merged 1 commit into from
Dec 12, 2024
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
33 changes: 33 additions & 0 deletions _posts/2024-12-11-power-systems-wiki.md
Original file line number Diff line number Diff line change
Expand Up @@ -72,6 +72,8 @@ toc:

## Ancillary Services

---

**_Ancillary services_** Those services necessary to support the transmission of electric power from seller to purchaser, given the obligations of control areas and transmitting utilities within those control areas, to maintain reliable operations of the interconnected transmission system. Ancillary services supplied with generation include load following, reactive power-voltage regulation, system protective services, loss compensation service, system control, load dispatch services, and energy imbalance services. [6]

More details about this can be found in Reference [7] - Appendix I: Regional Practices for Ancillary Services
Expand All @@ -80,6 +82,8 @@ More details about this can be found in Reference [7] - Appendix I: Regional Pra

## Frequency

---

**_Frequency Deviation_** A change in Interconnection frequency. [1]

---
Expand Down Expand Up @@ -149,6 +153,8 @@ In short, **_Secondary Control_** maintains the minute-to-minute balance through

## Entities

---

**_Balancing Authorities_** The responsible entity that integrates resource plans ahead of time, maintains Demand and resource balance within a Balancing Authority Area, and supports Interconnection frequency in real time. [1]

---
Expand All @@ -163,6 +169,8 @@ In short, **_Secondary Control_** maintains the minute-to-minute balance through

## Reserve

---

**_Spinning Reserve_** Unloaded generation that is synchronized and ready to serve additional demand. [1]

---
Expand Down Expand Up @@ -198,6 +206,8 @@ In short, **_Secondary Control_** maintains the minute-to-minute balance through

## Reliability, Security, and Stability

---

**_Stability Limit_** The maximum power flow possible through some particular point in the system while maintaining stability in the entire system or the part of the system to which the stability limit refers. [1]

---
Expand Down Expand Up @@ -235,6 +245,8 @@ Their relationships [3]:

### Stability

---

**_Rotor angle stability_** is concerned with the ability of the interconnected synchronous machines in a power system to remain in synchronism under normal operating conditions and to regain synchronism after being subjected to a small or large disturbance. [4]

---
Expand All @@ -253,6 +265,8 @@ There are also two categories of stability: **_Resonance Stability_** and **_Con

## Contingency

---

**_Most Severe Single Contingency_** The Balancing Contingency Event, due to a single contingency identified using system models maintained within the Reserve Sharing Group (RSG) or a Balancing Authority’s area that is not part of a Reserve Sharing Group, that would result in **the greatest loss** (measured in MW) of resource output used by the RSG or a Balancing Authority that is not participating as a member of a RSG at the time of the event to meet Firm Demand and export obligation (excluding export obligation for which Contingency Reserve obligations are being met by the Sink Balancing Authority). [1]

---
Expand All @@ -263,6 +277,8 @@ There are also two categories of stability: **_Resonance Stability_** and **_Con

## Horizon

---

**_Near-Term Transmission Planning Horizon_** The transmission planning period that covers Year One through five. [1]

---
Expand All @@ -273,6 +289,8 @@ There are also two categories of stability: **_Resonance Stability_** and **_Con

## Factors

---

**_Outage Transfer Distribution Factor (OTDF)_** In the post-contingency configuration of a system under study, the electric Power Transfer Distribution Factor (PTDF) with one or more system Facilities removed from service (outaged). [1]

---
Expand Down Expand Up @@ -302,6 +320,17 @@ There are also two categories of stability: **_Resonance Stability_** and **_Con

---

**_loss_zone_** In MATPOEWR, there is a bus parameter named "ZONE", and it means loss zone. [9]

**_Zone_** Zone: There is no clear definition, but my best guess is that it refers to different areas within the Bulk-Power System.

<div style="text-align: ;left;">
<img src="/assets/img/poster/PJM_zone_map.png" alt="PJM Zone Map" style="width: 700px; height: auto;">
<p><em>PJM Transmission Zones Map (from [10]) </em></p>
</div>

---

**_Region_** NERC divides North America into several regions for the purpose of reliability and coordination. Each region is responsible for ensuring the reliability of the bulk power system within its boundaries [8]. The six regions are:

- MRO: Midwest Reliability Organization
Expand Down Expand Up @@ -340,3 +369,7 @@ There are also two categories of stability: **_Resonance Stability_** and **_Con
[7] North American Electric Reliability Corporation, "Ancillary Service and Balancing Authority Area Solutions to Integrate Variable Generation," Mar. 2011. [Online]. Available: https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/IVGTF2-3.pdf

[8] North American Electric Reliability Corporation, "Technical Rationale and Justification for TPL-008-1,", Oct. 2024. [Online]. Available: https://www.nerc.com/pa/Stand/Project202307ModtoTPL00151TransSystPlanPerfReqExWe2023-07_TPL-008-1%20Technical%20Rationale%20-%20Draft_3_100724.pdf

[9] MATPOWER, "MATPOWER User’s Manuals," https://matpower.org/doc-original/manuals/

[10] PJM, "Transmission Zones Map," https://www.pjm.com/-/media/DotCom/about-pjm/pjm-zones.pdf
Binary file added assets/img/poster/PJM_zone_map.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Loading