Skip to content

Add GHC 9.12.1

Add GHC 9.12.1 #2828

Triggered via pull request January 3, 2025 08:53
Status Failure
Total duration 31m 28s
Artifacts

pipeline.yml

on: pull_request
nix-build
27s
nix-build
unit-tests
4s
unit-tests
runghc
10s
runghc
cabal
9s
cabal
cabal-doExactConfig
9s
cabal-doExactConfig
tests-benchmarks
11s
tests-benchmarks
multi-target
33s
multi-target
shellFor-single-package
14s
shellFor-single-package
shellFor-multiple-package
11s
shellFor-multiple-package
shellFor-hoogle
8s
shellFor-hoogle
shellFor-not-depends
12s
shellFor-not-depends
maintainer-scripts
7s
maintainer-scripts
plan-extra-hackages
6s
plan-extra-hackages
build-extra-hackages
6s
build-extra-hackages
hix
40s
hix
docs
57s
docs
hydra-ifdLevel-0-and-1
2m 49s
hydra-ifdLevel-0-and-1
hydra-ifdLevel-2
20m 15s
hydra-ifdLevel-2
hydra-ifdLevel-3
30m 16s
hydra-ifdLevel-3
closure-size
3s
closure-size
update-docs
4s
update-docs
check-materialization-concurrency
18s
check-materialization-concurrency
check-path-support
9s
check-path-support
haskell-nix-roots-do-not-require-IFDs
12s
haskell-nix-roots-do-not-require-IFDs
hydra-without-remote-builders-ghc8107
32s
hydra-without-remote-builders-ghc8107
hydra-without-remote-builders-ghc9101
25s
hydra-without-remote-builders-ghc9101
hix-cabal
2m 51s
hix-cabal
nix-tools
13s
nix-tools
Fit to window
Zoom out
Zoom in

Annotations

5 errors
hydra-ifdLevel-0-and-1
Process completed with exit code 1.
hydra-ifdLevel-2
The job running on runner linux-5-2 has exceeded the maximum execution time of 20 minutes.
hydra-ifdLevel-2
The operation was canceled.
hydra-ifdLevel-3
The job running on runner linux-7-2 has exceeded the maximum execution time of 30 minutes.
hydra-ifdLevel-3
The operation was canceled.