88 changes: 52 additions & 36 deletions src/user-guide/running-workflows/reflow.rst
Original file line number Diff line number Diff line change
Expand Up @@ -8,13 +8,13 @@ Multiple Flows
In Cylc, a *flow* is a self-propagating run through the workflow :term:`graph`
from some initial task or tasks.

Usually there is only one flow, the original one starting from the beginning of
the graph, but Cylc can manage multiple flows at once.
Often there is only one flow: the original one started automatically at the
beginning of the graph. But Cylc can manage multiple flows at once.

When a flow advances to a new task in the :term:`graph`, the task will only run
if it did not already run in the same flow.

See :ref:`below<flow-trigger-use-cases>` for suggested use cases and an
See below for suggested :ref:`use cases<flow-trigger-use-cases>` and an
:ref:`example<new-flow-example>`.

.. note::
Expand All @@ -32,7 +32,7 @@ Flow number ``1`` is triggered automatically by ``cylc play`` at :term:`schedule
start-up. The next flow started by :ref:`manual triggering<triggering-flows>`
gets the number ``2``, then ``3``, and so on.

Tasks with multiple flow numbers belong to multiple flows as a result of
Tasks can carry multiple flow numbers as a result of
:ref:`flow merging<flow-merging>` and :ref:`manual triggering<triggering-flows>`.

.. note::
Expand Down Expand Up @@ -64,15 +64,12 @@ Triggering in Current Flows

.. image:: ../../img/same-flow-n.png

With ``--wait`` the triggered task runs immediately but any downstream action
is delayed until the flows catch up. If there are multiple active flows at
trigger time, each one can continue on separately from the triggered task
(without re-running it) as they separately catch-up to it. Without
``--wait`` a single front of activity representing all active flows
continues immediately after triggering.
With ``--wait``, the result is the same except that any action downstream of
the triggered task is delayed until the first flow catches it.

**Behind active flows** the triggered task itself will re-run, then activity
will cease if the original flows already traversed the same part of the graph.
will cease if any of the original flows already traversed that part of the
graph.

Triggering in Specific Flows
``cylc trigger --flow=1,2 ID``
Expand All @@ -86,7 +83,7 @@ Triggering in Specific Flows
Triggering a New Flow
``cylc trigger --flow=new ID``

This triggers the task with a new flow number.
This triggers the task with a new, incremented flow number.

The new flow will re-run tasks that already ran in previous flows.

Expand Down Expand Up @@ -116,30 +113,41 @@ Special Case: Triggering ``n=0`` Tasks
Flow Merging In ``n=0``
-----------------------

If a task spawning into the ``n=0`` window encounters another instance of
itself (same name and :term:`cycle point`) from another flow, the two task
instances merge and carry both (sets of) flow numbers forward.
If a task spawning into the ``n=0`` :term:`window` finds another instance
of itself (same name and cycle point, different flow) already there, a single
instance of it will carry both (sets of) flow numbers forward from that point.
Downstream tasks belong to both flows.

Downstream tasks are considered to belong to both flows. Any number of flows
can merge like this.
Flow merging in ``n=0`` means flows are not entirely independent. One flow
might not be able to overtake another because one or more of its tasks might
merge in ``n=0``. Merging is necessary while task IDs - and associated log
directory paths etc. - do not incorporate flow numbers, because task IDs must
be unique in the active task pool.

.. note::
Flow merging in ``n=0`` means flows are not entirely independent. One flow
*might* not be able to overtake another because a task *might* merge in
``n=0``. Merging is necessary while task IDs do not incorporate flow numbers,
because we can't have multiple active tasks with the same ID.
Incomplete tasks
^^^^^^^^^^^^^^^^

Incomplete tasks are retained in the active window in expectation of
retriggering once fixed, to complete expected outputs and continue the flow.

If another flow encounters an incomplete task, one task will carry both flow
numbers forward on successfully completing its expected outputs.

.. TODO whether or not it automatically reruns in the later flow is still an
open question: https://github.com/cylc/cylc-flow/pull/4737
Stopping Flows
--------------

By default, ``cylc stop`` halts the entire workflow and shuts the scheduler
down. Individual flows can be stopped with ``cylc stop --flow=F``, however.
This removes the flow number ``F`` from all ``n=0`` tasks, and removes any
active-waiting tasks that have no remaining flow numbers.
By default, ``cylc stop`` halts the workflow and shuts the scheduler down.

Tasks with no flow numbers do not spawn children in the graph. If there are no
active flows left, the scheduler shut downs.
It can also stop specific flows: ``cylc stop --flow=N`` removes the flow number
``N`` from tasks in the active pool. Tasks that have no flow numbers left as a
result do not spawn children at all. If there are no active flows left, the
scheduler shuts down.

.. TODO update this section post https://github.com/cylc/cylc-flow/issues/4741
.. _flow-trigger-use-cases:
Expand All @@ -148,10 +156,9 @@ Use Cases
---------

Running Tasks Ahead of Time
To run a task now even though its prerequisites are not yet satisfied, just
trigger it. Use `--wait` if you don't want the triggered front to continue
immediately. The triggered task(s) will not re-run when the main flow front
catches up.
To run a task even though its prerequisites are not satisfied, just trigger
it. Use ``--wait`` if you don't want the new front to continue immediately.
Triggered task(s) will not re-run when the main flow front catches up.

Regenerating Products Behind a Flow
To re-run a sub-graph (e.g. because the original run was affected by a
Expand All @@ -163,15 +170,24 @@ Regenerating Products Behind a Flow
trunk of the graph.

Rewinding a Workflow
To rewind the workflow to an earlier point, to regenerate data or perhaps
to allow the workflow to evolve a new path into the future, trigger a new
flow at the right task(s) and then stop the original flow. (Alternatively,
stop the scheduler and play it again from the desired task(s)).
To rewind the workflow to an earlier point, perhaps to regenerate data and/or
allow the workflow to evolve a new path into the future, trigger a new
flow at the right place and then stop the original flow. (Alternatively,
stop the scheduler, install a new instance of the workflow, and play it
from the desired place in the graph).

Test-running Tasks in a Live Workflow
You can trigger individual tasks as many times as you like with
``--flow=none``, without affecting the workflow.

Processing Flow-specific Data
Flow numbers are passed to task environments, so it is possible to have
different flows process different datasets through the same graph. However
we do not recommend doing this. Generally, that's what cycling is for; and
besides, each task would have to be capable of processing multiple datasets
at once in case of :ref:`flow-merging`.


.. _new-flow-example:

Example: Rerun a Past Sub-graph
Expand Down