Bump golang.org/x/sys from 0.13.0 to 0.14.0 in /exporter #1938
build-and-test.yml
on: pull_request
setup-environment
28s
govulncheck
1m 19s
Matrix: unittest-matrix
Matrix: cross-build-collector
unittest
4s
Annotations
17 errors
checks
Process completed with exit code 2.
|
cross-build-collector (darwin, arm64)
Process completed with exit code 2.
|
cross-build-collector (linux, 386)
Process completed with exit code 2.
|
cross-build-collector (linux, amd64)
Process completed with exit code 2.
|
cross-build-collector (linux, arm64)
Process completed with exit code 2.
|
cross-build-collector (linux, ppc64le)
Process completed with exit code 2.
|
cross-build-collector (linux, arm, 7)
Process completed with exit code 2.
|
cross-build-collector (linux, s390x)
Process completed with exit code 2.
|
cross-build-collector (windows, amd64)
Process completed with exit code 2.
|
cross-build-collector (windows, 386)
Process completed with exit code 2.
|
unittest-matrix (~1.21.3)
Process completed with exit code 2.
|
unittest-matrix (~1.20.10)
The job was canceled because "_1_21_3" failed.
|
unittest-matrix (~1.20.10)
The operation was canceled.
|
test-coverage
Process completed with exit code 2.
|
lint
Process completed with exit code 2.
|
unittest
Process completed with exit code 1.
|
cross-build-collector (darwin, amd64)
Process completed with exit code 2.
|