Update lexical-core requirement from ^0.8 to ^1.0 #10952
Triggered via pull request
September 16, 2024 13:43
Status
Failure
Total duration
2m 40s
Artifacts
–
integration.yml
on: pull_request
Archery test With other arrows
2m 30s
Matrix: Pyarrow C Data Interface
Annotations
6 errors
Pyarrow C Data Interface (stable, 17)
Process completed with exit code 101.
|
Pyarrow C Data Interface (stable, 16)
The job was canceled because "stable_17" failed.
|
Pyarrow C Data Interface (stable, 16)
The operation was canceled.
|
Pyarrow C Data Interface (stable, 15)
The job was canceled because "stable_17" failed.
|
Pyarrow C Data Interface (stable, 15)
The operation was canceled.
|
Archery test With other arrows
Process completed with exit code 101.
|