Skip to content

Update DSL+Wait.swift (#1176) #576

Update DSL+Wait.swift (#1176)

Update DSL+Wait.swift (#1176) #576

Triggered via push November 8, 2024 23:54
Status Failure
Total duration 10m 28s
Artifacts

ci-swiftpm.yml

on: push
SwiftPM, Windows
4m 59s
SwiftPM, Windows
Matrix: swiftpm_darwin_monterey
Matrix: swiftpm_darwin_ventura
Matrix: SwiftPM, Linux
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
SwiftPM, Linux (swift:5.7)
Process completed with exit code 1.
SwiftPM, Linux (swift:5.8)
Process completed with exit code 1.
SwiftPM, Windows
Process completed with exit code 1.
SwiftPM, Darwin, Xcode 14.3.1
Process completed with exit code 1.
SwiftPM, Darwin, Xcode 14.0.1
Process completed with exit code 1.
SwiftPM, Darwin, Xcode 14.2
The job was canceled because "_14_0_1" failed.
SwiftPM, Darwin, Xcode 14.2
The operation was canceled.
SwiftPM, Darwin, Xcode 14.1
The job was canceled because "_14_0_1" failed.
SwiftPM, Darwin, Xcode 14.1
The operation was canceled.
SwiftPM, Darwin, Xcode 14.0.1
A brownout will take place on November 11, 14:00 UTC - November 12, 00:00 UTC to raise awareness of the upcoming macOS-12 environment removal. For more details, see https://github.com/actions/runner-images/issues/10721