Extend documentation and toy tutorial with scheduling within the context of a building with PV #481
Labels
documentation
Improvements or additions to documentation
Milestone
Follow-up from PR #451.
The tutorial for scheduling a toy battery can be followed up with an example of scheduling within the context of a building with local production from PV panels. If an optimization context isn't specified, the scheduler would exceed the available headroom as follows:
By setting the optimization context to take into account the building's local production (and self consumption, if any), the resulting schedule should no longer exceed the available headroom.
The text was updated successfully, but these errors were encountered: