ci: add coverage from #3089 to hubble testing in CNI Release Test Pipeline #3158
Azure Pipelines / CNI Release Test (Cilium Test - cilium_overlay_hubble Scale Test)
cancelled
Nov 20, 2024 in 3m 11s
Cilium Test - cilium_overlay_hubble Scale Test was canceled
Annotations
Check failure on line 141 in Build log
azure-pipelines / CNI Release Test (Cilium Test - cilium_overlay_hubble Scale Test)
Build log #L141
The Operation will be canceled. The next steps may not contain expected logs.
Check failure on line 142 in Build log
azure-pipelines / CNI Release Test (Cilium Test - cilium_overlay_hubble Scale Test)
Build log #L142
The operation was canceled.
Loading