ci: Cleanup ACN PR pipeline yaml #2861
Merged
Azure Pipelines / Azure Container Networking PR (E2E - AKS DualStack Overlay DualStack Overlay Test Suite | Linux - (dualstackoverlay_e2e))
cancelled
Jul 17, 2024 in 6m 38s
E2E - AKS DualStack Overlay DualStack Overlay Test Suite | Linux - (dualstackoverlay_e2e) was canceled
Annotations
Check failure on line 147 in Build log
azure-pipelines / Azure Container Networking PR (E2E - AKS DualStack Overlay DualStack Overlay Test Suite | Linux - (dualstackoverlay_e2e))
Build log #L147
The Operation will be canceled. The next steps may not contain expected logs.
Check failure on line 148 in Build log
azure-pipelines / Azure Container Networking PR (E2E - AKS DualStack Overlay DualStack Overlay Test Suite | Linux - (dualstackoverlay_e2e))
Build log #L148
The operation was canceled.
Loading