Skip to content

Latest commit

 

History

History
90 lines (90 loc) · 9.45 KB

timelog.md

File metadata and controls

90 lines (90 loc) · 9.45 KB

Note: times are represented in number of hours

Date Rishad Arnav Arshvir Edwin Simon Ahmed Task
2024/01/27 1 1 1 1 1 1 Intial project discussion
2024/01/27 0.5 Drafting project proposal
2024/01/27 0.25 Creating git repo, timesheet, initial setup
2024/01/28 0.5 Drafting human values section
2024/01/28 0.5 Writing Introduction part 2
2024/01/28 0.5 Deliverable 1 - functional properties & user scenarios
2024/01/29 0.5 0.5 0.5 0.5 0.5 0.5 Project proposal meeting
2024/01/29 0.25 Introduction pt2 slides
2024/01/29 0.25 Human values slides
2024/01/29 0.25 Prepare functional properties & user scenarios slides
2024/02/07 0.5 0.5 0.5 0.5 0.5 0.5 Project demo discussion
2024/02/10 0.5 Deliverable 2 work
2024/02/11 0.5 Deliverable 2 Buddy proposal
2024/02/12 0.5 Deliverable 2 work
2024/02/13 2.5 2.5 App mockup - brainstorming and creation
2024/02/18 0.5 Getting Android Studio project set up
2024/02/19 0.75 0.75 0.75 0.75 0.75 Group meeting to plan out D3
2024/02/20 1 Basic setup on navigation
2024/02/21 1.5 Setup on ModalNavigationDrawer
2024/02/23 0.5 Basic ViewModel setup
2024/02/23 2 2 Deliverable 3 - Demo backend dicussion and setup
2024/02/25 1.5 Deliverable 3 - Building sign in page UI
2024/02/26 0.75 0.75 0.75 0.75 0.75 0.75 Deliverable 3 - Group dicussion and progress update
2024/02/26 0.5 Deliverable 3 - Demo dashboard support branch
2024/02/27 1.5 Deliverable 3 - Pulling beacon data from ViewModel to Dashboard screen
2024/02/28 2.5 Deliverable 3 - Unsuccessfully attempted to get broken emulator working
2024/02/29 2.5 Deliverable 3 - Set up API query to pull beacons
2024/02/29 1.5 Deliverable 3 - Building create beacon page UI
2024/03/01 2 Deliverable 3 - Backend work for demo
2024/03/01 1.0 Deliverable 3 - Changes in prep for testing
2024/03/02 0.25 Deliverable 3 - Some more tweaks
2024/03/02 1 1 Deliverable 3 - Work on create beacon page
2024/03/03 2 Deliverable 3 - Backend work for demo
2024/03/03 1.5 5 Deliverable 3 - Work on create beacon page
2024/03/03 0.75 0.75 0.75 0.75 0.75 0.75 Deliverable 3 - Group dicussion
2024/03/03 1.25 1 Deliverable 3 - Bug fixing app crash
2024/03/04 1.5 1.5 1.5 1.5 1.5 1.5 Deliverable 3 - group meeting
2024/03/04 2 Deliverable 3 - Building Nearby Beacons UI
2024/03/04 2 2 2 Deliverable 3 - Bug fixing viewmodel
2024/03/04 1 1 Deliverable 3 - completing sign in page&drop beacon page without api
2024/03/04 1 2 Deliverable 3 - Fixing the UI for the dashboard
2024/03/04 1.5 0.75 Deliverable 3 - creating beacon logo
2024/03/05 1.75 Deliverable 3 - functional create beacon page, sending to db
2024/03/05 0.5 0.5 0.5 0.5 0.5 0.5 Deliverable 3 - group meeting
2024/03/05 2.5 2.5 Deliverable 3 - Backend work for postal code creation and beacon deletion
2024/03/06 1 1 1 1 1 1 Deliverable 3 - final meeting before demo
2024/03/08 1 Deliverable 3 - Completed Demo Summary of D3 Document
2024/03/05 3 Implement Authentication
2024/03/13 1 1 1 1 1 1 final demo meeting
2024/03/13 2 Finish Implementing Authentication
2024/03/16 2 Deliverable 4 - first two examples
2024/03/17 1 Deliverable 4 - third example
2024/03/17 3 Deliverable 5 - Writeup
2024/03/18 0.75 Deliverable 6 - Preliminary work on tags for backend
2024/03/19 1 Deliverable 6 - Preliminary work on tags for backend
2024/03/19 1 1 1 Deliverable 6 - Collaborative work session
2024/03/20 1 Deliverable 6 - Work on tags for backend
2024/03/22 1 Deliverable 6 - Work on tags based upon review
2024/03/23 1 Deliverable 6 - Work on tags based upon review
2024/03/25 2.5 Worked on getting in-app messaging working
2024/04/26 3 Worked on getting in-app messaging working
2024/03/27 0.5 0.5 0.5 0.5 0.5 final demo meeting
2024/03/27 4 Final demo - light and dark mode
2024/03/28 0.5 Deliverable 6 - Setup for reviews
2024/03/29 3.5 2 Deliverable 6 - Reviews
2024/03/30 1 Deliverable 6 - Reviews
2024/03/30 0.5 0.5 0.5 0.5 0.5 0.5 final demo meeting
2024/03/30 8.5 Final demo - frontend auth, finished themes, create account page
2024/03/31 1 Final Demo - Adapting reviews to work with email searches and creation
2024/03/31 2.5 Final Demo - Create Account Email Verification Frontend
2024/04/01 3 Final Demo - Created APIs to send Email Verificatin and tested
2024/04/01 2 Final Demo - Create new APIs for review using Auth Token
2024/04/01 2 implemented contact button on the nearby beacon page
2024/04/01 1 Deliverable 6 - Work on reports for backend
2024/04/01 3 Add tag to beacon creation
2024/04/01 2 Add tag filtering to nearby beacons
2024/04/01 2 Add distance filtering to nearby beacons
2024/04/01 3 Fixed the UI for tags on the drop beacon page
2024/04/01 1.5 Worked on getting user location on nearby beacon page
2024/04/01 2.25 1.75 2.25 1.75 Update beacon page bugfixes
2024/04/02 5 Final Demo - Create UI for Reviews and Report Page
2024/04/02 2 Final Demo - Create Users Controller and Testing Calls
2024/04/02 3 Final Demo - Optimized Review APIs to refresh list after submit
2024/04/02 4.5 final demo bugfixes
2024/03/03 5 5 5 5 5 5 final demo preperation, ui fixes, project wrap up
2024/04/08 1 D7 - final status report
2024/04/08 0.5 D7 - Started Harm Mitigation section of report