TKO Preparation

The Loop

Preparation works as an iterative loop over all unprepared deployment packages. Within each package, specific resources will be prepared (not all resources need to be prepared). It's common that a single iteration may not be enough, as each iteration may add new resources that would also need to prepared. It's also possible that preparation may cause other backend changes, for example the creation of new child deployments.

The preparation status per resource is set via the nephio.org/prepared annotation.

Once all preparable resources have been prepared, the Preparer marks the whole package as prepared by setting that annotation on a single resource of GVK deployment.nephio.org/v1alpha1, Deployment. The Preparer will automatically add this resource to a deployment package if it doesn't already exist. This annotation bubbles up to the deployment entity on the backend, for example as a column in a SQL table, making it trivial to query deployments by preparation state.

Note that a prepared package can be forced to re-prepare if the annotation is removed or set to "false".

Plugins

Preparation plugins are triggered by the presence of specific preparable GVK. Other resources are ignored (they are assumed to be already prepared).

Note that this is simply an optimization! We could potentially run all available plugins, they would simply do nothing if they don't find supported resources.

Simply registering a preparation plugin for a GVK will automatically mark all resources of that type as preparable. Additionally, TKO has built-in preparation for some GVK, e.g. topology.nephio.org, Placement.

It is possible to avoid preparation for a specific preparable resource by setting the nephio.org/prepare annotation. A common use case for this merges (see below).

Importantly, a preparation plugin works on the entire package, even though it is triggered by a single resource. This means that the plugin can reference and even update or delete other resources, as well as add new resources.

Not only that, but plugins get a TKO Data client. This means that they can generate new (child) deployments, templates, really anything that TKO can do. For example, topology preparation generates child deployments based on templates and sites. Those in turn can have additional topologies, which will be prepared in the next iteration, allowing for any level of topology nesting.

Merges

A common requirement for generating new child deployments, e.g. for expanding topologies, is that it's not enough to just copy over a template. We may also want to introduce modifications or additions to that template. In fact, it may even be necessary to do so if the template does not contain everything that is needed for preparation and/or validation to complete successfully. We call this "merging".

Merging covers addition, injection, and updates. It is the way for a template to accept "inputs" that it needs in order to be deployed successfully.

The prime example is the "merge" property of the topology Placement resource. There we specify a list templates and for each provide a selector for its target sites. The "merge" property per template lets us specific KRM in the topology package (via ObjectReferences) that should be merged into that template.

Merging is straightforward but flexible. It starts by copying the template as is into the deployment. The entire template can be modified during merging. New merged resources will just be added. If a resource already exists (identified by GVK+name), then it will be merged in: properties will be added or updated. This behavior can be further controlled with the nephio.org/merge annotation, for example if you want to replace the entire resource and not just merge properties. Additionally, the merged name can be changed the nephio.org/rename annotation, letting you mix and match when specifying multiple merges.

This scheme is powerful. It means that a topology package can include everything it needs to create its child deployments. Not only that, when deploying a topology you can further merge resources into it, so the topology itself can have "inputs".

Indeed, you can merge resources when creating a deployment via the data API. This includes the --merge flag for the tko deployment create CLI command.

This feature does introduce a small challenge. If you are including preparable resources to merge in a package, how will the Preparer know not to prepare them in the current deployment, and instead postpone preparation for the child deployments? For this use case we go back to the nephio.org/prepare annotation. When set to Postpone it means: don't prepare here, but prepare "later", which in this case means in all the child deployments. (After merging, the annotation value will be changed to Here.)

For an example, see the O-RAN CU.