You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
First I try matching to the route stop pattern, then I try matching to all route stop patterns identified from the route, then I match directly to the route. As noted in #35, sometimes the matched geometry is invalid, and appears to have a very high speed. I should automatically remove any matched schedule stop pairs where the imputed speed is above some max speed.
The text was updated successfully, but these errors were encountered:
First I try matching to the route stop pattern, then I try matching to all route stop patterns identified from the route, then I match directly to the route. As noted in #35, sometimes the matched geometry is invalid, and appears to have a very high speed. I should automatically remove any matched schedule stop pairs where the imputed speed is above some max speed.
The text was updated successfully, but these errors were encountered: