You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
We have a pipeline A -> B. A produces a resource X. If B consumes X and fails, we'd like to (optionally) rerun B with the same X. In our environment A runs super fast, while B takes forever, so its possible A has run 1-3 times in the time it took B to fail.
To complicate this further, we have this 4 times in parallel, which can make moving a particular git revision through our pipeline very difficult (lots of manual babysitting).
Ops Manager Team
The text was updated successfully, but these errors were encountered:
We have a pipeline A -> B. A produces a resource X. If B consumes X and fails, we'd like to (optionally) rerun B with the same X. In our environment A runs super fast, while B takes forever, so its possible A has run 1-3 times in the time it took B to fail.
To complicate this further, we have this 4 times in parallel, which can make moving a particular git revision through our pipeline very difficult (lots of manual babysitting).
The text was updated successfully, but these errors were encountered: