You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
During construction, building the "floor tile" base plate required for laying down floors over lattice causes the room (or maybe general area) to lose pressure considerably for a split second, enough to cause vacuum related injuries. (I ruptured a lung, and took brute damage to limbs). This occurred on deck 3 above the bar, as well as the maints just south. Did not test if it happens on other decks. It does not reoccur when placing additional flooring over the plating. It does reoccur when deconstructing, and reconstructing the lattice + plating.
What you expected to happen
Not getting spaced while doing chill construction.
What actually happened
When placing down the lattice, nothing strange happens. When placing the base plate floor onto the lattice, the kpa drops for about a game tick and then returns to normal. See above for extra detail.
Steps to reproduce
(Step 1) Place lattice indoors, probably over a room.
(Step 2) Place base plate onto lattice
(and so on) die, or have a hardsui
The text was updated successfully, but these errors were encountered:
Brief description of the bug
During construction, building the "floor tile" base plate required for laying down floors over lattice causes the room (or maybe general area) to lose pressure considerably for a split second, enough to cause vacuum related injuries. (I ruptured a lung, and took brute damage to limbs). This occurred on deck 3 above the bar, as well as the maints just south. Did not test if it happens on other decks. It does not reoccur when placing additional flooring over the plating. It does reoccur when deconstructing, and reconstructing the lattice + plating.
What you expected to happen
Not getting spaced while doing chill construction.
What actually happened
When placing down the lattice, nothing strange happens. When placing the base plate floor onto the lattice, the kpa drops for about a game tick and then returns to normal. See above for extra detail.
Steps to reproduce
The text was updated successfully, but these errors were encountered: