You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The mining office in this map by station start, Appears to have wires not connected to the APC Itself. Which made me have to connect the APC as an engineer to resolve the power issue not being conncected to external power pretty much.
The text was updated successfully, but these errors were encountered:
Reporting client info:
Round ID:
171
Testmerges:
Reproduction:
The mining office in this map by station start, Appears to have wires not connected to the APC Itself. Which made me have to connect the APC as an engineer to resolve the power issue not being conncected to external power pretty much.
The text was updated successfully, but these errors were encountered: